New walls of refrigerator car
Opposing the winter weather, the resumed the works by the beer refrigerator car. Despite the short days we’ve managed to cut and fit the paneling of side walls, leaving some place for a pair of double doors in the middle. Lately we continued the works by the front walls. It appeared to be a rather complicated task – to gain access we had to partially disassemble the side walls, temporarily held in place with clamps. After several hours of cutting and fitting, we managed to complete the first front wall. It’s worth noting that due to the car’s function, each wall consist of two layers between which a layer of insulation is sandwiched. Therefore, when completed, our car will be able to handle its original purpose.
In the coming weeks we are going to complete second front wall and give the paneling some initial polish. Next step will be filling the space between the walls, roof and floor with insulation.